CU Boulder, 18th Street Utility Engineering

CU Boulder, 18th Street Waterline, Utility Engineering

The F&D engineers provided engineering consulting, design and construction management services for over 1,000 feet of an 8 inch PVC waterline to replace an existing main line which runs the length of 18th Street across the Boulder campus and also included upgrades to the stormwater drainage system. Challenges on the project included avoiding conflict with existing utilities, crossing underneath two utility tunnels and the working on one of the busiest streets and pedestrian areas on the campus. The project was successfully completed on an aggressive schedule during the summer break with the F&D team providing scheduling, construction management and construction inspection services.