Grand County, Foundation Assessment

grand county admin building

The F&D engineers provided the County with an engineering assessment of the Administration Building foundation system which was constructed in 1936. The assessment was prompted by the need to renovate the structure and possibly add a third story to the building. Our engineers provide an in-depth inspection of the foundation systems, and surrounding areas, provided updated CAD drawings and assisted the commissioners review several different design options. After careful consideration, the third story expansion was put on-hold and an extensive remodel of the existing floors was determined to be the best alternative to use the spaces more efficiently.